Leif Nilsson, CEO & Director of Surge Copper (TSX.V:SURG – OTCQX:SRGXF), joins us for a comprehensive update on all the news and company milestones, including ongoing exploration and development work at the flagship copper-molybdenum-silver-gold Berg Project in British Columbia.
We start off having Leif outline the key economic metrics from the Preliminary Economic Assessment PEA released in June 2023, for a sense of the size and scale of the Project, and how it stacks up to other large copper development assets in Canada.
This leads into a discussion on how the project economics would change with sensitivities to current metals prices closer to spot pricing. Leif also spends some time breaking down the conservative method the Company uses for calculating copper equivalent figures, compared to many peer companies in the sector, and why it is a more fair and accurate approach. We also highlight the critical minerals components for the copper and molybdenum mineralization, and how these provide some optionality when looking at raising capital for the development of the project down the road.
With regards to exploration, the 2024 field program completed a total of 10 diamond drill holes for 3,707 meters being at the Berg Project and 2 holes at the Ootsa Project for 897 meters. All 10 holes at the Berg deposit are expected to support resource definition and conversion of Inferred resources to higher confidence categories.
Drilling Highlights released to date:
6 of the Berg deposit holes underwent downhole geotechnical testing, including Packer tests, piezometer installations, and televiewer surveys, supporting pre-feasibility mining studies. Core samples will also undergo geochemical analysis and acid-base accounting test work during the winter, supporting ARD/ML environmental baseline and pre-feasibility studies on waste rock management. An environmental baseline data collection program was initiated across the project area to bolster previously completed database efforts. A pre-feasibility level metallurgy program is ongoing and slated for completion in early 2025, with a Pre-Feasibility Study (PFS) slated for late in 2025, but there has not been a precise date set at this point.
If you have any follow-up questions for Leif regarding Surge Copper, then please email them to me at [email protected].
Click here to follow along with the latest news from Surge Copper
4.3
1111 ratings
Leif Nilsson, CEO & Director of Surge Copper (TSX.V:SURG – OTCQX:SRGXF), joins us for a comprehensive update on all the news and company milestones, including ongoing exploration and development work at the flagship copper-molybdenum-silver-gold Berg Project in British Columbia.
We start off having Leif outline the key economic metrics from the Preliminary Economic Assessment PEA released in June 2023, for a sense of the size and scale of the Project, and how it stacks up to other large copper development assets in Canada.
This leads into a discussion on how the project economics would change with sensitivities to current metals prices closer to spot pricing. Leif also spends some time breaking down the conservative method the Company uses for calculating copper equivalent figures, compared to many peer companies in the sector, and why it is a more fair and accurate approach. We also highlight the critical minerals components for the copper and molybdenum mineralization, and how these provide some optionality when looking at raising capital for the development of the project down the road.
With regards to exploration, the 2024 field program completed a total of 10 diamond drill holes for 3,707 meters being at the Berg Project and 2 holes at the Ootsa Project for 897 meters. All 10 holes at the Berg deposit are expected to support resource definition and conversion of Inferred resources to higher confidence categories.
Drilling Highlights released to date:
6 of the Berg deposit holes underwent downhole geotechnical testing, including Packer tests, piezometer installations, and televiewer surveys, supporting pre-feasibility mining studies. Core samples will also undergo geochemical analysis and acid-base accounting test work during the winter, supporting ARD/ML environmental baseline and pre-feasibility studies on waste rock management. An environmental baseline data collection program was initiated across the project area to bolster previously completed database efforts. A pre-feasibility level metallurgy program is ongoing and slated for completion in early 2025, with a Pre-Feasibility Study (PFS) slated for late in 2025, but there has not been a precise date set at this point.
If you have any follow-up questions for Leif regarding Surge Copper, then please email them to me at [email protected].
Click here to follow along with the latest news from Surge Copper
376 Listeners
5,675 Listeners
144 Listeners
3,063 Listeners
933 Listeners
95 Listeners
252 Listeners
91 Listeners
1,352 Listeners
127 Listeners
383 Listeners
55 Listeners
381 Listeners
34 Listeners
91 Listeners