In this podcast, the Ricardo talks about Rolling Wave Planning. He explained that the planning is more detail in the near term and detail in high level in the far term. Ricardo notes that this procedure is indicated when the project has a long duration (more than 1 year), where the horizon and estimate of cost and time is poor.
By Ricardo Viana Vargas4.5
3939 ratings
In this podcast, the Ricardo talks about Rolling Wave Planning. He explained that the planning is more detail in the near term and detail in high level in the far term. Ricardo notes that this procedure is indicated when the project has a long duration (more than 1 year), where the horizon and estimate of cost and time is poor.