
Sign up to save your podcasts
Or


Ridgeline Minerals CEO, Chad Peters, talks about the work previously done at both Swift and Black Ridge, and what the company is expecting for those projects in 2024. Ridgeline anticipates an additional US $5.2 million to be spent by NGM across both projects in 2024, the bulk of which will be directed towards follow-up drilling at Swift, followed by data collection and target generation at Black Ridge.
By Trevor Hall4.6
9090 ratings
Ridgeline Minerals CEO, Chad Peters, talks about the work previously done at both Swift and Black Ridge, and what the company is expecting for those projects in 2024. Ridgeline anticipates an additional US $5.2 million to be spent by NGM across both projects in 2024, the bulk of which will be directed towards follow-up drilling at Swift, followed by data collection and target generation at Black Ridge.

3,067 Listeners

149 Listeners

141 Listeners

408 Listeners

361 Listeners

262 Listeners

23 Listeners

94 Listeners

1,338 Listeners

374 Listeners

71 Listeners

273 Listeners

414 Listeners

70 Listeners

155 Listeners